Why Grangegorman DIT chose a Solar System

Grangegorman DIT decided to purchase an 11 Kwp P.V system complete with battery storage.

The reasoning behind this was twofold 1: To allow PHD students observe and study battery storage systems in a renewable power environment.

2: To have the battery storage system charge during daylight hours and provide charging power for the electric vehicles on campus during night time. The project was a success and is continuing to be monitored on an ongoing basis.

Client Testimonial

To Whom It May Concern.

Wyse solar solutions were employed to design, install and commission an 11 Kwp solar Photovoltaic system to charge a battery bank from which our electric vehicles on Campus charge at night. So far the system is running fantastically well for which we are thankful to Wyse solar solutions.

It also must be noted that on completing the installation Health and Safety was of primary importance due to the student body on Campus. The team at Wyse solar guided us through the process from the arrival of the crane to the removal of debris with knowledge and precision. We are very grateful to them and would have no hesitation in recommending the Company.